Abiodun Sobowale Richmond Texas. Email: sobowaleabiodun@yahoo.com
Phone:
281-975-8210 PROJECT PLANNER/SCHEDULER PROFESSIONAL SUMMARY Proficient in
preparing and executing schedules, project cost & schedule analysis,
reporting, forecasting, man-hour budgeting; start-up and shot-down schedules
in oil & gas industry, pipeline channelization and construction industry
and Chemical Plants. Ability to effectively use SAP, Primavera P6 and 8.3 to
develop standard maintenance Work Package for Corrective and Preventive
Maintenance. Develop project schedules involving transportation and
installation of subsea & onshore drilling equipment’s, maintenance
turnaround schedules on power plants. Expertise in project controls
principles, theories, and concepts, develop WBS and tract project activities
with adequate predecessor and successor & logic. Possess strong
communication and interpersonal skills used to interface daily with the
project, construction & Engineering managers and client representatives. SKILL SAP, Primavera P6 and 8.3, Microsoft
Project, Excel, Word, PowerPoint. PROFESSIONAL EXPERIENCE Hess
Corporation, Minot. ND Planner/Scheduler
July 2014- Dec 2015 §
Worked on a
channelization of pipeline for oil and gas, shipping and delivery to site
such as steel pipes, fibre glass, flanges, supports and other fittings. §
Created and
maintained a schedule for each project, identified and recorded the impact of
work performed and not performed as scheduled. §
Worked
independently to prepare accurate schedules and integrated different projects
together for a high level monitoring. § Reviewed schedules for usefulness, logic, level of detail,
input sources, timing, and consistency with the Current Estimate and WBS §
Identify
critical Path Activities (CPA) and near critical and advise project team
accordingly, integrated subcontract schedules with project master
schedule §
Updated
project schedule weekly with accurate data-entry of data-date reports
throughout project cycle §
Managed
multiple projects and assignments to meet reporting timelines. §
Furnished
progress reports for meetings using Primavera and Office report tools. §
Reviewed
project schedule and advised project team on time control issues while
adhering to best practices §
Created and
revised schedule templates based on project type and scope detailing the
sequence of all work to be performed, prior to project start. §
Worked
directly with the Project Manager and Project team members to identify and
resolve problems in the area of Planning & Scheduling. §
Supports
the work management process through creation of planned work packages to
ensure compliance with all Hess Safety Rules, standards, and work practices. §
Worked
independently and Prepared schedule from start to finish and maintaining
existing schedules. §
Analyze
problem defect/issue fault to diagnose the cause and determine scope of
repair. §
Develop
Work Package for complex maintenance jobs with necessary information to allow
efficient scheduling. §
Determine parts
and materials needed for repair §
Monitor delivery
dates and track receipt of ordered goods §
Apply SAP status
codes to Work Order to track progress in the P&S process §
Keep track of
available resource levels and maintain work center capacities in SAP §
Facilitate the
daily YTT meeting and update the schedule daily §
Adjust the
schedule to facilitate emergency work requirements (break-ins), changes in
priorities and resources § Keep lines of communication open with equipment owners and
technical authorities
Amec Paragon Project Planner/Scheduler
Jan 2012-June 2014 §
Prepared
estimates & managed cost for Engineering team, controlled and reported
monthly expenses and variances. §
Developed
schedule from issue of LOA till closeout and work closely with the
engineering team to prepare a detailed and comprehensive schedules. §
Reported
monthly expenses by divisions and product lines §
Tracked and
Managed project risk, impact and generate responses. §
Maintained
existing schedules based on the WBS, with task definitions, dependencies,
relationships and sequence to determine critical and near critical
activities. §
Monthly
presentation of all projects within my product line in Power point, Pivot
Table and S curve in P6 §
Monitored
cost progress, compared to baseline and forecast cost estimates §
Reported
on-time delivery and guide against activities running into backlog/late. §
Populated
metrics of project status, analyzing project schedule to align with project
scope and deadline §
Integrated
multiple projects for master scheduling/high level planning for overall view
of budget, time and other risk attached. §
Reported
weekly Engineering hours from timesheet progress reporter, controlling weekly
on-site activities and prioritizing procurement of materials. §
Worked
directly with the Project Manager and Project team members to identify and
resolve problems in the area of Planning & Scheduling. §
Supports
the work management process through creation of planned work packages to
ensure compliance with all Hess Safety Rules, standards, and work practices. Mobil oil
Nigeria Ltd Project
Planner/Scheduler
Jan
2005 – Dec 2011 §
Worked
independently and Prepared schedule from start to finish and maintaining
existing schedules. §
Forecasted
estimate at completion and estimate to completion for labor man-hours, in
accordance with established methods §
Coordinated
with Project Engineers and other departments as required to define the
requirements of the project. §
Reported
on-time delivery and guide against activities running into backlog/late. § Maintained all project forecasts and payment schedules § Assisted in the development of cost control procedures and
implemented project cost code structure (WBS). § Monitored variances from the current budget and assisted
all project members with the control, formulation and interpretation of
budgets, trends, and estimates at completion. § Ensured that all the preparation of the required weekly
and monthly work hour and cost status reports are prepared for the monthly
meeting. §
Integrated
multiple projects for master scheduling/high level planning for overall view
of budget, time and other risk attached. §
Interfaced
with various project departments regarding cost reporting requirements and
ensures that information is correctly and efficiently submitted.
EDUCATION America
Intercontinental University. Master’s in
Project Management. Ongoing University of
Agriculture, Abeokuta Nigeria. Certificate in
Computer Programming. University of
Nigeria, Bachelor’s Degree in Arts Education. PROFESSIONAL
MEMBERSHIP & CERTIFICATION ·
Member,
Project Management Institute ·
Synergy
between Mechanical and Electrical Engineering (Training) ·
Leading
your Sphere of Influence (Certification) · Member, Nigeria Institute of Management |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
French |
Advanced |
|
|
|